Sacramento asbestos removal
Older resilient floor tile, especially the 9-inch-square kind, sheet vinyl with a felt backing and the black cut-back adhesive under many floors can contain asbestos. Tile that is intact and left alone is a low risk; the problem is grinding, sanding or breaking it up to lay a new floor. Removal is done with the tile kept wet and broken as little as possible, and the mastic is taken off with methods that do not make dust.
Older kitchens, bathrooms, laundry rooms and hallways often hold several floors stacked on top of each other. A typical cross-section, top down: modern vinyl plank or laminate, a layer of sheet vinyl from a 1970s or 1980s update, then the original resilient tile glued to the subfloor or slab with dark adhesive. Each layer is a separate material for testing. Sheet vinyl deserves particular attention because the felt-like paper backing, not the shiny wear layer, is the part that sometimes contained asbestos. Resilient floor tile and its adhesive fall in the category federal rules call non-friable: they hold fibers tightly until they are broken, ground or sanded.
None of these confirm asbestos. They only make a sample worth taking, and the testing process describes how each layer is cut and labeled.
The aim is to keep a non-friable material from turning friable. The floor is misted, and tiles are lifted with a long-handled floor scraper or spud bar, working under the edge so most come up whole or in large pieces. Brittle tiles may need a heat gun or more water to release. Sheet vinyl is wetted and cut into strips, then rolled up rather than torn. Black mastic left on a slab is softened with a low-odor mastic remover and scraped up as a paste, then the slab is cleaned. Grinding, sanding or bead-blasting mastic is the step to avoid unless it happens inside full containment with HEPA dust collection, because that is where a floor job becomes a fiber release.
The older neighborhoods of Sacramento, such as Land Park, Curtis Park and Oak Park, have the region's oldest houses and the most layered floors. Citrus Heights homes from the 1970s commonly have sheet vinyl and resilient tile from that decade. North of Highway 50 in Rancho Cordova, 1950s-1970s ranch homes and small apartment buildings make up the older half of the city.
Unit turnovers are the regulated case. In an apartment building with five or more units, a renovation that disturbs 160 square feet or more of suspect flooring falls under Sac Metro Air's Rule 902, which is relevant to landlords in Carmichael, where apartments make up a larger share of housing than in nearby suburbs. In Roseville, a regulated building's notification goes to U.S. EPA Region 9 rather than a local district. Owner-occupied houses, the majority in Fair Oaks, are generally outside Rule 902, but the method of removal does not change with the paperwork.
Tile and mastic waste is bagged or wrapped while still damp, labeled, and taken to a landfill that accepts asbestos waste, with the paperwork the receiving site requires. It cannot go in a household trash bin or a roll-off with general demolition debris. Larger jobs that pull tile throughout a building are usually part of pre-demolition and remodel abatement, and ceilings in the same rooms are covered under textured ceiling removal.
How long does it take? A kitchen or bathroom floor is often a single day of removal, depending on the layers found. Larger areas or several layers take longer.
These often turn up in the same building or the same project:
Samples analyzed by an accredited lab before a remodel, sale or demolition, so you know what you are dealing with.
Read more →Acoustic ceiling texture tested, then wetted and scraped inside a sealed room, leaving a clean ceiling ready to finish.
Read more →Asbestos removed before demolition or a major remodel, including transite siding and pipe, roofing and interior materials, so the project can move forward.
Read more →Written estimate
Don’t sand, scrape or sweep it. A quick description is enough to start.
We will call to talk through the material and next steps. Until then, please leave it undisturbed. To talk sooner, call (916) 884-5785
Something went wrong sending your request. Please call (916) 884-5785 and we’ll take the details over the phone. Your answers are still filled in below if you’d rather try again.